Contractor Testing Services
Click here to email us
1-800-966-9596
What We Offer
Obtaining a Trade License
Test Preparation
License Information
General Information
License Requirements
Reciprocal Agreements
License Classifications
Request License Information
Frequently Asked Questions
Concrete
Construction Glossary
Electric Glossary
General Engineering Glossary
Green
Landscape
Landscape Irrigation
Painting
Plumbing
Roofing
Tile and Terrazzo Glossary


|
NOTE: All questions are written and reviewed by licensed contractors who are actively working in the field.
The following questions are typical of the kind of items that are on the examination.
The correct answer is highlighted.
- When engineering calculations are required for a sign, who is authorized to prepare these
calculations?
- a. a licensed mechanical engineer
- b. a licensed C45 (Electrical Sign) contractor
- c. a licensed civil engineer
- d. a licensed A (General Engineering) contractor
- When manufacturing a rain lip on an exterior exposed raceway, where on the raceway should
the rain lip be located?
- a. left side
- b. bottom
- c. right side
- d. top
- Whose guidelines/specifications should be followed when determining load capacities for
crane and lifting equipment?
- a. project manager and engineer
- b. building owner and architect
- c. project manager and the EPA
- d. equipment manufacturer and Cal/OSHA
|