Contractor Testing Services
Click here to email us
1-800-966-9596
What We Offer
Obtaining a Trade License
Test Preparation
License Information
General Information
License Requirements
Reciprocal Agreements
License Classifications
Request License Information
Frequently Asked Questions
Concrete
Construction Glossary
Electric Glossary
General Engineering Glossary
Green
Landscape
Landscape Irrigation
Painting
Plumbing
Roofing
Tile and Terrazzo Glossary


|
The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (28%)
- Assessment of job site conditions
- Materials selection
- Materials calculation
- Equipment and tools
- (11%)
- Causes of paint failure
- Substrate repair
- Removal of wallcoverings
- (23%)
- Site protection
- Preparation of sound surfaces
- Preparation of contaminated surfaces
- Preparation of failed coatings
- Preparation of surfaces for wallcovering
- Pressure washing
- Repair of holes and cracks
- (14%)
- Application of primers
- Application of finishes
- Application of specialty coatings
- (7%)
- Exterior surfaces
- Interior surfaces
- Refinishing
- (17%)
- Hazard identification
- Elevated work
- Personal protection
- Waste disposal
|