The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (30%)
- Evaluate weather and mix design
- Prepare areas for surface coatings
- Apply surface coatings
- (21%)
- Evaluate project site
- Read plans and specifications
- Estimate material and equipment
- Estimate time and labor
- Contact authorizing agency
- (19%)
- Evaluate weather conditions
- Layout striping and pavement marker patterns
- Remove conflicting striping and pavement markers and clean area
- Apply striping and pavement markers
- (18%)
- Design traffic control plan
- Install and remove traffic control
- Protect public from safety hazards
- Identify and correct unsafe working conditions
- (6%)
- Apply game court surface coatings and striping
- Apply airport/heliport surface coatings and striping
- Install speed bumps, wheel stops, guardrail, attenuators, parking control gates, etc.
- (6%)
- Evaluate cause of pavement failure
- Remove and replace damaged pavement
|