California Contractor School Online®
The premiere contractor school to assist you in passing your state contractor license exam.
Home | National License Info | Request License Information | License Classifications | Practice Test Logon
Contractor Testing Services

Click here to email us
1-800-966-9596

What We Offer
Obtaining a Trade License
Test Preparation



License Information

General Information
License Requirements
Reciprocal Agreements
License Classifications
Request License Information
Frequently Asked Questions



Construction Glossaries

Concrete
Construction Glossary
Electric Glossary
General Engineering Glossary
Green
Landscape
Landscape Irrigation
Painting
Plumbing
Roofing
Tile and Terrazzo Glossary



USABuildersBooks.com



USAConstructionMall.com
State Test Contents

C-23 Ornamental Iron Work

The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:

  1. Project Planning and Estimating (25%)
    • Jobsite measurements and calculations
    • Shop specifications
    • Installation requirements

  2. Ornamental Metal Fabrication (24%)
    • Material layout and preparation
    • Pre-fabrication and metal forming
    • Metal fabrication

  3. Grinding and Finishing Ornamental Metal (12%)
    • Metal preparation
    • Metal finish

  4. Onsite Installation of Ornamental Metal (15%)
    • Product delivery and critical path coordination
    • Drilling, assembly, and finishing

  5. Safety (24%)
    • Fire prevention
    • Shop and jobsite equipment
    • Working in elevated areas

About Us | Contact Us | Terms and Conditions

Copyright © 2005-2011 Contractor School Online®