Contractor Testing Services
Click here to email us
1-800-966-9596
What We Offer
Obtaining a Trade License
Test Preparation
License Information
General Information
License Requirements
Reciprocal Agreements
License Classifications
Request License Information
Frequently Asked Questions
Concrete
Construction Glossary
Electric Glossary
General Engineering Glossary
Green
Landscape
Landscape Irrigation
Painting
Plumbing
Roofing
Tile and Terrazzo Glossary


|
The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (24%)
- Existing system evaluation
- Plan and specification interpretation
- Electrical calculations
- Code requirements
- Material selection
- (25%)
- System Layout
- Clearance and accessibility requirements
- Raceway and panel installation
- Wire and equipment labeling
- Grounding and bonding
- (20%)
- Finish device placement and installation
- Trims and sealants
- System energizing and testing
- (13%)
- Common electrical problems
- Location, repair, and replacement of inoperable
electrical wires/components
- Selection and use of electrical testing equipment
- (18%)
- Lock out/tag out procedures
- Personal protective equipment (PPE)
- Tools/equipment
|