Contractor Testing Services
Click here to email us
1-800-966-9596
What We Offer
Obtaining a Trade License
Test Preparation
License Information
General Information
License Requirements
Reciprocal Agreements
License Classifications
Request License Information
Frequently Asked Questions
Concrete
Construction Glossary
Electric Glossary
General Engineering Glossary
Green
Landscape
Landscape Irrigation
Painting
Plumbing
Roofing
Tile and Terrazzo Glossary


|
The Examination is divided into several major sections. Note that all percentages are estimations. These sections are:
- (20%)
- Plans and specifications
- Estimation
- Standards, codes, & regulations
- General building mathematics
- (8%)
- Structural framing
- Seismic safety
- Basic engineering
- (18%)
- Worker and site safety
- Traffic control
- Environmental impact
- (15%)
- Earthwork
- Soils and geology
- Surveying
- Site preparation
- (20%)
- Shoring and scaffolding
- Permanent and temporary piling
- Waterproofing
- Utilities
- Tunneling, drilling, and boring
- Drainage and water work
- Trenching and pipeline
- Sewers, water, and storm drain systems
- (9%)
- Concrete principles and placement
- Forms and falsework
- Foundations
- (5%)
- Industrial plants
- Mechanical, electrical, and plumbing
- Masonry
- Painting and coating
- Demolition
- (5%)
- Highways and roads
- Parking lots
|